Guidelines For Installation Of Under Deck Drainage Greenville SC

Posted by Unknown on 1:25 AM with No comments
By Robert Hamilton


The space below your deck is made all weather resistant through designing of under deck drainage system. This means that you will use the space below your deck even when it is raining. The rainwater collection enhances this. Thus, you will not get wet during the rainy season. The good news is that the installation tips for under deck drainage Greenville SC provided here are simple to be used by homeowners.

Before commencing on the project, you should have the necessary equipment. Some of the equipment required include chalk line, stepladder, safety glasses, water diverters, screw gun or hammer, vinyl flashing, tape measures, galvanized roof nails and tape measures.

For you to have a smooth process of installation, you will need to prepare as far as the equipment is concerned. Once the installation is successful, you will be sure the space underground is spared for other use. You will need to use the chalk line to be able to join the mark next to your home with the joist bottom. The marks should be an inch from each other while the beam length should be ten feet. Snapping the chalk line will give you the right pitch line.

Connect the water diverters between all the joists. This collects the water then drains it in the drainage system of the deck. Then diverter at the ledger board should then be connected. When you are in the right position, you should then stick the diverter to the joist with the use of a caulking bead that is water resistant.

Step number three will be to install joist, with the assistance of the pitch line make sure you place in the first beam rail. The rail should not be less than an inch from your home. Repeat the exercise until you reach the bottom of the joist. You should make sure that the space between each joist rail is not more than two inches. Work on both sides of each joist.

Collector panels installation is the fourth step. This is a simple step. You should start at the last part of your home and continue to the joist end. Water will be collected when the collector panel is flat. This is not good since you are aiming at draining water.

Gutters attachment is the final step. The good news is that this is another simple process. You should slightly pull the drain when pushing over joists. When connected to joist rails it will snap back in position firmly. The gutter should be a quarter inches short when compared with the length of the beam. This will help in expansion accommodation.

When the joist gutter is in the right position, boundary drains should be installed that will be used on the two joists located outside. Furthermore, they will snap back into the right place. At the joist edge, you should connect the flashing. This will help in diverting the water away. With these simple steps, you make use of the under deck at your desired time.




About the Author: